• Direct Push Sampling
         Soil Sampling:
         Drive Casing 4.5", 3.75", 3.50" and 2.25

 

  • Hollow Stem Augering
         4.25 and 6 5/8

 

  • Monitoring Well Installation
         Conventional 1", 2" and 4" wells
         Pre-pack Wells 1", 1.25" and 2"

 

  • Air Sparge Well Installation
         Soil Gas Sampling:
               PRT Sampling
               Passive System (Gore Sorber)
               Vapor Implants

 

  • Chemical Injection

 

  • Abandonment of Wells

 

  • Test Pit Excavation

 

  • Air Vacuum Excavation
  • GPR (Ground Penetrating Radar)
  • Utility Markout